INFRASTRUCTURE PIPELINE 

Explore the comprehensive project pipeline featuring infrastructure opportunities available for private sector financing. The Infrastructure Forum can provide further information on each of these opportunities and introductions into the relevant sponsor Department 

Sizewell C 

Sizewell C nuclear power station is a project to construct a 3,200 MWe nuclear power station with two EPR reactors in Suffolk, England.

Number of Projects in Programme: 1

Region: East of England 

Funding: Public / Private 

Planning Approved: Yes - DCO Granted 2022

Total Funding Required: £ TBC Bn

Responsible Department: DESNZ

Economically Regulated: Yes

Utilising Modern Methods of Construction: Yes

Expected / Start of Works: TBC

CONTACT

River Thames Scheme - Capacity Improvements and Flood Channel

The main engineering works include the construction of the new flood channel in two sections, and the capacity improvements to existing river structures, lowering the riverbed downstream of the Desborough Cut.

Number of Projects in Programme: 1

Region: East of England 

Funding: Public / Private 

Planning Approved: DCO Not Yet Approved

Total Funding Required: £ 717 Mn

Responsible Department: Environment Agency

Economically Regulated: Yes

Utilising Modern Methods of Construction: Yes

Expected / Start of Works: 2030

CONTACT

Silvertown Tunnel

The Silvertown Tunnel is a road tunnel under construction beneath the River Thames between the Greenwich Peninsula and west Silvertown. 

Number of Projects in Programme: 1

Region: London

Funding: Public / Private 

Planning Approved: DCO Granted 2018

Total Funding Required: £ X Bn

Responsible Department: Department for Transport 

Economically Regulated: Yes

Utilising Modern Methods of Construction: Yes

Expected / Start of Works: 2020

CONTACT

LWW Hull and Haltemprice Surface Water and Sewerage Drainage Improvements

The Living with Water Blue Green Plan proposes a catchment scale approach for surface water management in Hull and the surrounding area. 

Number of Projects in Programme: 1

Region: Yorkshire and The Humber

Funding: Public / Private 

Planning Approved: Yes

Total Funding Required: £ 78 Mn

Responsible Department: Environment Agency

Economically Regulated: Yes

Utilising Modern Methods of Construction: Yes

Expected / Start of Works: 2026

CONTACT

bottom of page